Unreliable infrastructure
Single points of failure, a network without redundancy, links to remote sites that keep dropping. We find the weak spots and decide what to change first.
Industrial Infrastructure & Engineering
We survey, design, modernise and support industrial networks, telecom, industrial control systems, telecontrol, energy metering, perimeter security and pump stations at operating plants.
Discuss a technical task Our expertise
01Tasks
Single points of failure, a network without redundancy, links to remote sites that keep dropping. We find the weak spots and decide what to change first.
Equipment is discontinued, software is no longer updated, spare parts are gone. We plan the replacement in stages while the existing systems keep running.
Controllers, data concentrators, SCADA and metering from different vendors do not exchange data. We connect them over standard protocols: IEC 60870-5-104, IEC 61850, Modbus, OPC UA.
Nobody maintains the configurations, changes are not recorded, after a failure there is nothing to restore from. We take systems under scheduled maintenance with documentation.
02Services
Each stage can be ordered separately. The result of a stage is a document or a commissioned system that any contractor can continue working with.
Result: a technical report, up-to-date diagrams and an action plan.
Result: a technical solution with the scope of work and an equipment specification.
Result: a working system, as-built diagrams, configurations and test reports.
Result: systems in a controlled state and clear terms of service.
03Deliverables
Every stage closes with documents you can keep working with: to approve, to procure, to operate.
Actual state of the systems, risks and prioritised recommendations.
Block, functional and wiring diagrams in their current state.
Equipment, materials and work items for procurement and the contract.
What was tested, how, and with what result.
Diagrams as installed, configurations and access credentials.
Service schedule and a change log for every system.
04Expertise
Eight areas. Each has its own page: scope of work, typical tasks and the result.
Ethernet, routing, segmentation, redundancy, secure connections.
Learn moreFibre lines, DWDM/CWDM, SDH, MPLS-TP, links to remote sites.
Learn moreICS, SCADA, telecontrol, industrial gateways and protocols.
Learn moreEnergy metering, data concentrators, generation and consumption forecasts, reports.
Learn moreVirtualisation, redundancy, monitoring, support.
Learn moreOT and IT segmentation, access control, technical protection measures.
Learn morePassive fibre detectors with no power in the field, perimeters from 10 km, CCTV.
Learn moreFire fighting for car parks and buildings, multistage and borehole pumps, automation.
Learn more05Industries
Substations, power plants, renewable sites: energy metering, telecontrol, process telecom, data transfer to dispatch centres.
Control system networks, integration of equipment from different vendors, energy metering, server infrastructure, perimeter security of large sites.
Long-distance telecom networks, supervisory control of remote sites, channel redundancy.
Telecontrol of distributed sites, security of pipelines of any length, industrial networks, secure data exchange with control rooms.
Telecom and data transmission systems, supervisory control of utility systems, fire-fighting pump stations of car parks and buildings, monitoring.
06Approach
Work is planned so that production does not stop: switchovers only in agreed maintenance windows.
Decisions are based on the actual state of the systems, not on nameplate data and old diagrams.
We take into account the existing equipment, operating modes and the requirements of the operations and security teams. We change only what needs changing.
Shutdowns and switchovers that affect production follow an approved plan with a rollback option.
Diagrams, configurations, credentials and the change log are kept from the first day of work.
Work ends with tests under a programme and the handover of documentation, configurations and credentials to the customer.
Commissioned systems can be handed over to us for maintenance under an agreed SLA.
07Questions
If your question is not here, ask it in the form below and we will answer specifically.
No. It is enough to describe the site and the task. If needed, the terms of reference are drawn up after the survey. Ready terms of reference can be attached to the request.
A site visit, inspection of equipment and links, collection of configurations, interviews with the operations team. The result is a report and up-to-date diagrams with a list of risks and recommendations.
Work follows an agreed plan. Switchovers and shutdowns that affect production are performed only in agreed maintenance windows with a rollback option.
Yes. The survey records the actual state; after that the system can be modernised or taken under support.
The list of work, the maintenance schedule and the SLA parameters are fixed in the contract based on the survey: the systems involved, the operating mode of the site and its criticality.
Yes, at the customer's request: an NDA is signed before diagrams, configurations and credentials are handed over.
Almaty, Astana, Shymkent, Kazakhstan. Site visits are arranged by agreement.
08Cooperation
A survey, diagnostics, a technical solution or a single modernisation. The result is a report, a design or an accepted system.
Discuss a taskFrom the survey to commissioning and handover of documentation. One contractor at every stage.
Discuss a projectScheduled maintenance of existing systems with an agreed list of work and an SLA.
Discuss support09Contacts
Describe the site and the task: survey, modernisation, integration or support. We will reply and propose a format of work.
What happens after you get in touch
Call us, message us on WhatsApp or send an e-mail — tell us about the site and the task.